Tuesday, 23 July 2013

The 18th fairway, putting back the top soil.

The fairway levelling is almost complete. Just the topsoil to go on, then seed to finish. 





Monday, 22 July 2013

Adjusting the levels on the 18th fairway.

This week the 18th fairway is being re-levelled. This is to help reduce the flooding in this area. The work is going well and should be completed by Friday.